Gallery
GENERAL CARGO TERMINAL
Capacity 800 tonsCargo Terminal had been designed for the transportation of dry and containerized liquid cargos in the Caspian Sea. Cargo will be unloaded on the east side of the jetty area by 4 port cranes. Each container is then identified, listed, documented and transported to the far north e nd …
Pilotaj slogan
Pilotage Upon entry into Zira Port, all commercial vessels (regardless of their size) need to contact the control tower, request pilotage, and enter the port under the guidance and steering of the port pilot.Pilotage is understood to be an advisory service for the captains of vessels and floating craft, which is given on board these …
Logistic Service
Transportation services in Zira Port are carried out by ADO-G Logistics LLC. The company has all the necessary vehicles for transportation of passengers, cargos, dangerous goods, etc. ADO-G Logistics is capable to organize the entire logistics process for individuals and corporations, from transporting client’s goods to providing value-added services such as storage, inventory, etc. Goods …
Crew Transfer Services
Zira Port has a specially designed passage for transportation of large and small crews from terminal area to vessels. Prior to boarding the vessel, crew members that are listed on thecheck-list are gathered in front of the main gate for HSE and other related procedures. Upon finishing the procedures, passengers walk towards the vessels under …
Agent
fdfdfdjjfdjfdjfjkdfjkdjkfjk fdsffsfsfd “ADO-G Marine Services” LLC based on the Customer’s request provides ship agency in good faith in the interests of ship owners and in accordance with the contractual terms of individual written instructions of the ship owner and the usual marine practice. It acts within the general powers of the sea agent, in accordance …
Supply
Water Supplyde Fresh water is transported into the yard through a branch pipeline connected to the Oghuz-Gabala-Baku water pipeline. It is then stored in a 150 ton tank container, buried on the far northend of the premises. A 1430 m water pipeline is laid throughout the perimeter of the facility. Pumps are installed near the …
Waste Management
Solid Waste Management The garbage containers located inside the premises are sufficient to store household and domestic waste. If necessary, an additional trash chute will be provided for storing hazardous waste. A 10 m³ garbage truck will be available for the collection and transportation of the waste from the yard to the disposal area. …
Bunkering
Fuel SupplyThe fuel is brought into the yard on 10 m3 tank trucks and then pumped into the 10 m3 tankers buried on the northwest side of the facility. It is then transported to the jetty area by a pipeline running near the east wall of the premises. The pipeline is protected inside a concrete …